Turkmenistan CNPC Chuanqing Drilling&Central Asia Pipeline Amu Darya Right Bank Oil and Gas Exploration and Production Construction Project

As a long-term international logistics service provider in Central Asia for CNPC Chuanqing Drilling, Wulian Eurasia has participated in the transportation of materials for the construction of gas fields such as Samandepe and South Yolotan since the launch of the largest natural gas project on the right bank of the Amu Darya River in 2008. It has undertaken nearly 70% of the project's road transportation business and has shipped more than 2500 vehicles. The project materials include drilling rigs, pipelines, steel structures, barracks, various mechanical equipment, production materials, vehicles, etc. The transportation methods include road, intermodal transportation (Bishkek railway), self driving, and large-scale transportation. There are several lines involving Turgat Port in South Xinjiang and Khorgos Port in North Xinjiang. The customs supervision transport vehicles from Türkiye, Uzbekistan and Kazakhstan have been deployed overseas, and their contributions to the project have been highly praised by customers.

Project Name: CNPC Chuanqing Drilling Right Bank Oil and Gas Exploration and Production Construction Project on the Amu Darya River

Project duration: 2008 to 2015

Goods name: Drilling rig, pipeline, steel structure, barracks, various mechanical equipment, production materials, vehicles, etc

Transportation information: Over 2500 vehicles, with a total weight of approximately 36000 tons and a total volume of approximately 120000 cubic meters

Transportation modes: road, intermodal transportation, self driving, and large item transportation

Transportation route: Turgat Port to Farap (or Amu Darya) in Turkmenistan; Khorgos Port - Farap (Amu Darya), Turkmenistan;

Line mileage: 2300 kilometers to 2800 kilometers