Kyrgyzstan Zijin Mining Group&Outongke Left Bank Gold Mine Project

Since 2008, when Jinmai International Company of Zijin Mining Group entered the Central Asian market, Wulian Eurasia has maintained a long-term and stable cooperative relationship with Zijin Mining as the exclusive international road service provider for its Tajikistan Kuzhande ZGC gold mine project. In 2011, Zijin Mining acquired Kyrgyzstan Outongke Co., Ltd., and the Tald Blak Left Bank Gold Mine project was officially launched, with the construction unit being MCC 15th Bureau.

Project Name: Zijin Mining Jinmai International Kyrgyzstan Outongke Left Bank Gold Mine Construction Project

Project timeline: From 2012 to 2015

Goods name: Mining car, ball milling equipment, steel structure, insulation material, steel, various mechanical equipment, building materials, vehicles, etc

Transportation information: Over 230 vehicles, with a total weight of approximately 5200 tons and a total volume of approximately 13000 cubic meters

Transportation methods: highway, large cargo transportation, self driving

Transportation route: Urumqi Kashgar Turgat Port Tardebrak;

Line mileage: 760 kilometers